Referrals

Andy Garcia
Operations Supervisor of Soka University – Pump repairs.

Phil Fleming
Facility Director of the Fullerton Joint USD/Olympic swimming pool pump removal, repairs, and installation.

Don May
President of Chestnut Square HOA – submersible pump removals, repairs and installation.

Mike Dunbar
General Manager – Emerald Bay Service District.

Michael Sanders
Project Engineer – Partner Engineering and Science, Inc.310-765-7272Lake pump removal and installation.

Brian Baughmann
Field Manager – Three Arch Bay Association
949-499-4567
Pump repair and replacement.

New system installed “Crystal Ball”, enables Brian to remotely control the pump via PC or cell phone. The system also allows to view system status and acquire total gallons pumped from the basin via “The Cloud”.

See how we work

Take a look at our work